This project will improve the water quality of the Galisteo River and maintain access to our Sustainable Learning Center. We are seeking donations to help us accomplish this work. Click here to donate!

Just a mile upstream of our project area is the village of Madrid, a historic coal mining town with a severely degraded watershed. The need for channel stabilization has been identified by the AML as well as the community of Madrid and there are currently plans to rebuild and restore our shared arroyo where it goes through the village. As part of the AML project, there is an area where stormwater will be redirected to the location where it used to flow before the industrialization of the town for the coal mining industry.
We need to take a similar approach for Ampersand’s channel stabilization project.
View drone footage of an active flood in the area we plan to reclaim.
Madrid’s surrounding gob piles and erosion patterns reveal a very degraded watershed. We have already completed a major restoration project to mitigate the impact of the old railroad bed. That bed, bisecting Ampersand’s property, has resulted in the channelization and downcutting of the Madrid Arroyo. In 2012 we received a grant from Partners for Fish and Wildlife to preserve the ecological health of the land we steward. We also got a Watershed Forum grant from NMED to offer a weekend workshop to construct and teach about erosion control structures. Here is a video about that project. We have been maintaining and improving upon this work for the last decade and have incorporated it into our educational programs here at our Sustainable Learning Center.

Now we need to stabilize the area downstream of our previous work. We have the opportunity to redirect stormwater so that it will flow into its previous meander pattern and infiltrate into a large floodplain area. In the current stream channel, each flood digs deeper into upland soils, creating 15 to 20 foot cliffs on either side of the arroyo. This area would be a continual source of sediment resulting in the further destabilization of the downstream channel.
At this point, increased sediment flowing downstream from Madrid and the AML project, would create an increased deposition pattern that exacerbates our erosion problem area. Our project will supplement the work done by AML and increase the positive impact for our whole watershed.
Stream Channel restoration expert and teacher Bill Zeedyk has offered his consulting and design services to Ampersand for this work. We now have a plan that will reduce the threat of future erosion problems in this very unstable bend. It would never stabilize naturally in the foreseeable future without destroying the road and the only access to Ampersand’s property. We have a good plan that enhances water quality and wildlife habitat as well as protects our access.

We need $22,000 to complete this project.

This is the plan that Bill Zeedyk has helped us with. We have enough large rocks on site to construct the rock structures. We will hire a contractor to run some large machinery for moving all the dirt around. We plan to transplant as much as we can of the plants that need to be removed.
The culvert itself will be $1K.